Welcome to Wagners CFT monthly newsletter, which has been created to keep you informed on designing, constructing and working with FRP.
View in browser
website-logo
Enewsletter Banner Image (2)

Cockayne Reserve Pedestrian Bridge, Castle Hill, New South Wales

Wagners Composite Fibre Technologies (CFT)

August 2024

 

Welcome to Wagners Composite Fibre Technologies' (CFT) monthly newsletter, which has been created to keep you informed on designing, constructing and working with Fibre Reinforced Polymer (FRP) profiles.

Admirals Arch (4)

WEBINAR ALERT!

Case Study: Admirals Arch

Design & construction of a unique ecotourism experience in a harsh and remote location.

REGISTER NOW!

Explore how Magryn & Associates and Larcombe General Builders designed and constructed a world-class ecotourism experience in one of Australia's most remote and harsh environments.

REGISTER NOW to secure your online seat or recorded copy.

utility poles (1)

NEWS STORY

Major contracts solidify growth and expansion for Wagners CFT

READ MORE

Several key contracts for the supply of Fibre Reinforced Polymer (FRP) utility poles throughout NSW and Qld have solidified future growth for Wagners CFT and triggered expansion into larger profiles and green technology.

READ MORE for the full story!

John Dignam

NEW EXECUTIVE DIRECTOR

Focus on continuous improvement & growth

READ MORE

Wagners CFT welcomes new Executive Director, John Dignam to the helm of its global Fibre Reinforced Polymer (FRP) manufacturing business.

John brings a wealth of knowledge and extensive experience in manufacturing for construction and infrastructure both here in Australia and overseas. 

READ MORE for the full story!

Bluewater Trail under construction

CASE STUDY

Design & Analysis of Composite Materials in Bluewater Enviro Trail

READ MORE

Bluewater Trail in Mackay, Queensland includes 1.8km of shared pathway and 800 metres of boardwalk that meanders through the environmentally sensitive flood plain of Pioneer River.  This case study looks at the challenging local conditions and complexity of the brief to deliver an innovative structural solution that provided zero maintenance for the asset owner and minimised environmental disturbance.

READ MORE for the full case study.

Untitled design (21)

PRODUCT SPOTLIGHT

Trident Marine Piles

DOWNLOAD BROCHURE

Trident Marine Piles are pultruded from Fibre Reinforced Polymer (FRP) and coated with a High Density Poly Ethylene outer sleeve giving them the same stiffness as an equivalent sized timber pole, but a fraction of the weight and dramatically improved durability. 

LEARN MORE

Contact Us (2)

CONTACT US

Let us help you with your next project

CONTACT US

Contact Us to discuss your next project and tap into the extensive knowledge bank of in-house FRP experts at Wagners CFT.  

We manufacture our profiles right here in Australia and have in-house design and construction teams, so we know FRP from the ground up.

CONTACT US for your next project.

Social Media Montage (3)

Follow Us On Socials

Keep up to date with everything going on at Wagners CFT through LinkedIn. Facebook and YouTube!

LinkedIn
YouTube
Facebook

Wagners CFT ANZ, 11 Ballera Court, Wellcamp, Queensland 4350, Australia, +61 (0)7 4637 7777

Unsubscribe Manage preferences